Frequently asked questions
Straight answers to the questions we hear most often. If yours isn't here, get in touch directly.
Cost
How much does a renovation cost in Sydney?
It depends entirely on scope — a cosmetic refresh and a full bathroom strip-out in the same size room can differ by ten times the cost, because of waterproofing, plumbing and compliance work. See the Pricing page for indicative rate bands by job type, then get a free on-site inspection for a real number.
Is the quote fixed, or can the price change later?
The quote is fixed once you sign it. The only way the price changes is a documented variation — something discovered once walls or floors are opened up, or a change you request — and that's always agreed and priced before we proceed, never billed after the fact.
Timeline
How long does a typical renovation take?
A laundry or cosmetic refresh can be days. A bathroom is usually 3–5 weeks. A kitchen is similar. A whole-home renovation runs months, depending on scope and whether it's staged. You'll get a realistic timeline in writing as part of your quote.
What causes renovations to run late?
Most commonly: something unexpected found once walls or floors are opened (old wiring, water damage, asbestos), material lead times, or approvals taking longer than expected. We flag risk areas during the inspection so there are as few surprises as possible.
Permits and approvals
Do I need council approval for my renovation?
Cosmetic and like-for-like work usually doesn't. Structural changes, second-storey additions, and some external work often need a Development Application (DA) or Complying Development Certificate (CDC). We'll tell you which applies during the on-site inspection, not after work has started.
Do you handle the approvals process?
We can advise on what's needed and coordinate the approvals process as part of the project — you don't have to navigate council requirements alone.
Payment schedule
How much deposit do you require?
For work over $20,000, NSW law caps the deposit at 10% of the contract price — we don't ask for more than that. See the Pricing page for the full payment schedule.
How are progress payments structured?
Tied to completed stages of work, not to dates on a calendar — you pay for what's actually finished.
Living on site
Can I stay in my home during the renovation?
Often yes for a single-room renovation, especially if you have a second bathroom. For a whole-home renovation done all at once, it's usually not practical. We'll be upfront about which applies to your project before you commit.
How do you keep the site liveable if we stay?
Site protection, dust control between work areas, and keeping essential services (water, one working bathroom, kitchen access where possible) functioning are all part of how we plan a job around an occupied home.
Warranty claims
What's covered under warranty?
Every job carries your NSW statutory warranty (6 years on major defects, 2 years on other defects) plus a written VTA workmanship warranty of 1–3 years depending on the job. Full detail is on the Guarantee page.
How do I make a warranty claim?
Call or email with a description and photos of the issue — see the Guarantee page for the full claim process and what happens next.
Insurance work
Do you work directly with insurers and assessors?
Yes — we work to the insurer's approved scope of works and liaise directly with the assessor on any variations, so you're not relaying technical detail back and forth yourself.
What if the damage is worse than the insurer's original scope?
It's common with water and storm damage — we document and photograph any variation and get it approved through the proper channel before proceeding.
Material selection
Do I have to choose all the materials myself?
No — material selection help is available as part of most quotes if you want it, or we'll work strictly to your brief if you already know what you want.
Do you use the same materials regardless of budget?
No — material and brand specification is itemised in your quote so you can see exactly what's being used, and can ask to adjust it up or down before work starts.